RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2708030630 - Archived data from Thu, 15. April 2021 17:01:26 CEST


This is all the information about APD 2708030630. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2708030630
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C02
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.7 V
Dark current: 9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 80
Position in Box: 42
EP1 batch: 65
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.4533157 V     T = -25 °C: 347.0264986 V
Voltage for Gain 150: T = +20 °C: 390.378067 V     T = -25 °C: 354.4807333 V
Voltage for Gain 200: T = +20 °C: 394.7923344 V     T = -25 °C: 358.6544206 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.426128277 V-1     T = -25 °C: 4.884528381 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.569873122 V-1     T = -25 °C: 8.966920018 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.73935662 V-1     T = -25 °C: 15.80709079 V-1
Break-through voltage: T = +20 °C: 410.8515356 V     T = -25 °C: 374.4396452 V
   
Notes:


Version history

Time Author Change comment
27. Oct 2021 14:11:24 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:26 CEST jreher Updated box and position via API.
05. Feb 2021 10:58:41 CET jreher Updated box and position via API.
03. Feb 2021 18:24:11 CET jreher Updated box and position via API.
11. Aug 2020 17:38:20 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:01 CET jreher Updated APD location via API.
25. Nov 2019 17:17:16 CET jreher Updated box and position via API.
10. Sep 2019 11:21:15 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 11:00:38 CEST markus.moritz
25. Jul 2019 12:14:15 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:56 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:26 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:08 CEST Tobias Imported from Hamamatsu datasheet.