RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2708030621 - Archived data from Wed, 03. February 2021 18:24:11 CET


This is all the information about APD 2708030621. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2708030621
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2708030621/2010022215
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 9.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 80
Position in Box: 36
EP1 batch: 65
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.3126301 V     T = -25 °C: 346.1950001 V
Voltage for Gain 150: T = +20 °C: 389.1929988 V     T = -25 °C: 353.6095079 V
Voltage for Gain 200: T = +20 °C: 393.5942165 V     T = -25 °C: 357.7563541 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.515061244 V-1     T = -25 °C: 4.847841914 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.776098913 V-1     T = -25 °C: 9.90115749 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.29220135 V-1     T = -25 °C: 15.79207799 V-1
Break-through voltage: T = +20 °C: 409.2551413 V     T = -25 °C: 373.2183432 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:40 CET jreher Updated box and position via API.
03. Feb 2021 18:24:11 CET jreher Updated box and position via API.
11. Aug 2020 17:38:19 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:47:25 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:19 CET jreher Updated box and position via API.
27. Nov 2019 19:43:00 CET jreher Updated APD location via API.
25. Nov 2019 17:17:16 CET jreher Updated box and position via API.
10. Sep 2019 11:20:57 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 10:58:53 CEST markus.moritz
25. Jul 2019 12:14:15 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:55 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:25 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:04 CEST Tobias Imported from Hamamatsu datasheet.