RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2708030618 - Archived data from Wed, 03. February 2021 18:24:10 CET


This is all the information about APD 2708030618. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2708030618
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2708030618/2803031029
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 379.8 V
Dark current: 9.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 80
Position in Box: 33
EP1 batch: 65
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.6175909 V     T = -25 °C: 344.4324356 V
Voltage for Gain 150: T = +20 °C: 387.4493326 V     T = -25 °C: 351.7873076 V
Voltage for Gain 200: T = +20 °C: 391.8106958 V     T = -25 °C: 355.9082609 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.43309874 V-1     T = -25 °C: 4.804215384 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.597278078 V-1     T = -25 °C: 9.742815606 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.86330453 V-1     T = -25 °C: 15.53578192 V-1
Break-through voltage: T = +20 °C: 407.7686826 V     T = -25 °C: 371.4574523 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:40 CET jreher Updated box and position via API.
03. Feb 2021 18:24:10 CET jreher Updated box and position via API.
11. Aug 2020 17:38:18 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:53:29 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:10 CET jreher Updated box and position via API.
27. Nov 2019 19:43:00 CET jreher Updated APD location via API.
25. Nov 2019 17:17:16 CET jreher Updated box and position via API.
10. Sep 2019 11:20:57 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 10:57:09 CEST markus.moritz
25. Jul 2019 12:14:15 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:55 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:25 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:02 CEST Tobias Imported from Hamamatsu datasheet.