Subdetector specification:  
Serial: 2708030605
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G06
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.8 V
Dark current: 11.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 80
Position in Box: 23
EP1 batch: 65
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1336594 V     T = -25 °C: 345.8841491 V
Voltage for Gain 150: T = +20 °C: 388.9259775 V     T = -25 °C: 353.2645239 V
Voltage for Gain 200: T = +20 °C: 393.254701 V     T = -25 °C: 357.4074156 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.61849639 V-1     T = -25 °C: 5.003873093 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.250681582 V-1     T = -25 °C: 9.380452512 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.53147136 V-1     T = -25 °C: 14.81596789 V-1
Break-through voltage: T = +20 °C: 408.4311929 V     T = -25 °C: 372.5463484 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:19:17 CET jreher Assigned to capsule by script
05. Feb 2021 10:58:38 CET jreher Updated box and position via API.
03. Feb 2021 18:24:09 CET jreher Updated box and position via API.
18. Dec 2020 14:01:32 CET jreher Updated box and position via API.
11. Aug 2020 17:38:16 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:59 CET jreher Updated APD location via API.
25. Nov 2019 17:17:15 CET jreher Updated box and position via API.
10. Sep 2019 11:20:56 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 10:54:06 CEST markus.moritz
25. Jul 2019 12:14:14 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:54 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:25 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:03:56 CEST Tobias Imported from Hamamatsu datasheet.