RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2708030605


This is all the information about APD 2708030605. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2708030605
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 3003033355/2708030605
Unit: #1705 (barcode 1309018246)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G06
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.8 V
Dark current: 11.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 80
Position in Box: 23
EP1 batch: 65
EP1 batch after irradiation: 10181
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1336594 V     T = -25 °C: 345.8841491 V
Voltage for Gain 150: T = +20 °C: 388.9259775 V     T = -25 °C: 353.2645239 V
Voltage for Gain 200: T = +20 °C: 393.254701 V     T = -25 °C: 357.4074156 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.61849639 V-1     T = -25 °C: 5.003873093 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.250681582 V-1     T = -25 °C: 9.380452512 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.53147136 V-1     T = -25 °C: 14.81596789 V-1
Break-through voltage: T = +20 °C: 408.4311929 V     T = -25 °C: 372.5463484 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
09. Feb 2021 11:19:17 CET jreher Assigned to capsule by script
05. Feb 2021 10:58:38 CET jreher Updated box and position via API.
03. Feb 2021 18:24:09 CET jreher Updated box and position via API.
18. Dec 2020 14:01:32 CET jreher Updated box and position via API.
11. Aug 2020 17:38:16 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:59 CET jreher Updated APD location via API.
25. Nov 2019 17:17:15 CET jreher Updated box and position via API.
10. Sep 2019 11:20:56 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 10:54:06 CEST markus.moritz
25. Jul 2019 12:14:14 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:54 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:25 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:03:56 CEST Tobias Imported from Hamamatsu datasheet.