RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2708030598 - Archived data from Wed, 03. February 2021 18:24:08 CET


This is all the information about APD 2708030598. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2708030598
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F14
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.8 V
Dark current: 16.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 80
Position in Box: 16
EP1 batch: 65
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.7177902 V     T = -25 °C: 350.8755595 V
Voltage for Gain 150: T = +20 °C: 394.5688463 V     T = -25 °C: 358.3670007 V
Voltage for Gain 200: T = +20 °C: 398.9099376 V     T = -25 °C: 362.5661155 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.385231463 V-1     T = -25 °C: 4.898292905 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.545016485 V-1     T = -25 °C: 9.092650895 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.90457516 V-1     T = -25 °C: 16.15239502 V-1
Break-through voltage: T = +20 °C: 413.8314665 V     T = -25 °C: 377.4764513 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:38 CET jreher Updated box and position via API.
03. Feb 2021 18:24:08 CET jreher Updated box and position via API.
11. Aug 2020 17:38:14 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:59 CET jreher Updated APD location via API.
25. Nov 2019 17:17:14 CET jreher Updated box and position via API.
10. Sep 2019 11:20:56 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 10:50:08 CEST markus.moritz
25. Jul 2019 12:14:13 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:54 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:25 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:03:54 CEST Tobias Imported from Hamamatsu datasheet.