RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2708030596 - Archived data from Tue, 11. August 2020 17:38:14 CEST


This is all the information about APD 2708030596. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2708030596
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.7 V
Dark current: 13.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 80
Position in Box: 14
EP1 batch: 65
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7750591 V     T = -25 °C: 345.6304653 V
Voltage for Gain 150: T = +20 °C: 388.6025334 V     T = -25 °C: 352.9759147 V
Voltage for Gain 200: T = +20 °C: 392.9519117 V     T = -25 °C: 357.1039917 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.706118408 V-1     T = -25 °C: 4.714013682 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.320089905 V-1     T = -25 °C: 9.523248131 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.59560487 V-1     T = -25 °C: 15.02072859 V-1
Break-through voltage: T = +20 °C: 408.1156777 V     T = -25 °C: 371.9355744 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:22:12 CET jreher Assigned to capsule by script
05. Feb 2021 10:58:37 CET jreher Updated box and position via API.
03. Feb 2021 18:24:08 CET jreher Updated box and position via API.
18. Dec 2020 14:00:18 CET jreher Updated box and position via API.
11. Aug 2020 17:38:14 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:58 CET jreher Updated APD location via API.
25. Nov 2019 17:17:14 CET jreher Updated box and position via API.
10. Sep 2019 11:20:56 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 10:47:50 CEST markus.moritz
25. Jul 2019 12:14:13 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:54 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:25 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:03:53 CEST Tobias Imported from Hamamatsu datasheet.