RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2708030595 - Archived data from Wed, 07. October 2020 12:19:31 CEST


This is all the information about APD 2708030595. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2708030595
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2708030595/1906020744
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: H07
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 384.6 V
Dark current: 12.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 80
Position in Box: 13
EP1 batch: 64
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.8589915 V     T = -25 °C: 348.3328596 V
Voltage for Gain 150: T = +20 °C: 391.6948823 V     T = -25 °C: 355.7783862 V
Voltage for Gain 200: T = +20 °C: 396.030598 V     T = -25 °C: 359.9387381 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.691906972 V-1     T = -25 °C: 4.798206352 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.398851562 V-1     T = -25 °C: 9.786769255 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.81740593 V-1     T = -25 °C: 15.54485696 V-1
Break-through voltage: T = +20 °C: 409.2768085 V     T = -25 °C: 374.9504092 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:37 CET jreher Updated box and position via API.
03. Feb 2021 18:24:08 CET jreher Updated box and position via API.
07. Oct 2020 12:19:31 CEST jreher Assigned to capsule by script
06. Oct 2020 16:52:58 CEST jreher Updated box and position via API.
11. Aug 2020 17:38:14 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:58 CET jreher Updated APD location via API.
25. Nov 2019 17:17:14 CET jreher Updated box and position via API.
10. Sep 2019 11:20:56 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 10:46:51 CEST markus.moritz
25. Jul 2019 12:14:29 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:54 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:25 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:03:52 CEST Tobias Imported from Hamamatsu datasheet.