RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2708030589 - Archived data from Wed, 03. February 2021 18:24:07 CET


This is all the information about APD 2708030589. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2708030589
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2708030589/2704030288
Unit: #1374 (barcode 1309013937)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.2 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 80
Position in Box: 7
EP1 batch: 64
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.0548365 V     T = -25 °C: 344.0587259 V
Voltage for Gain 150: T = +20 °C: 386.8965764 V     T = -25 °C: 351.3920612 V
Voltage for Gain 200: T = +20 °C: 391.2761706 V     T = -25 °C: 355.5230988 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.628071954 V-1     T = -25 °C: 4.969384258 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.092583473 V-1     T = -25 °C: 9.236989165 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.09160677 V-1     T = -25 °C: 16.47271264 V-1
Break-through voltage: T = +20 °C: 407.3325873 V     T = -25 °C: 371.054291 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:36 CET jreher Updated box and position via API.
03. Feb 2021 18:24:07 CET jreher Updated box and position via API.
07. Oct 2020 12:16:38 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:16 CEST jreher Updated box and position via API.
11. Aug 2020 17:38:13 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:32:28 CET jreher Updated box and position via API.
27. Nov 2019 19:42:58 CET jreher Updated APD location via API.
25. Nov 2019 17:17:14 CET jreher Updated box and position via API.
10. Sep 2019 11:20:35 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 10:44:58 CEST markus.moritz
25. Jul 2019 12:14:28 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:53 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:24 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:03:50 CEST Tobias Imported from Hamamatsu datasheet.