RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2708030586 - Archived data from Tue, 11. August 2020 17:38:12 CEST


This is all the information about APD 2708030586. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2708030586
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.4 V
Dark current: 9.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 80
Position in Box: 4
EP1 batch: 64
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.4833924 V     T = -25 °C: 344.2528714 V
Voltage for Gain 150: T = +20 °C: 387.2936985 V     T = -25 °C: 351.5853941 V
Voltage for Gain 200: T = +20 °C: 391.6517439 V     T = -25 °C: 355.6913552 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.482814349 V-1     T = -25 °C: 4.901878914 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.711667371 V-1     T = -25 °C: 9.964447232 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.18371985 V-1     T = -25 °C: 15.98950582 V-1
Break-through voltage: T = +20 °C: 407.2127631 V     T = -25 °C: 370.9377773 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 16:12:06 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:18:12 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:58:36 CET jreher Updated box and position via API.
03. Feb 2021 18:24:07 CET jreher Updated box and position via API.
11. Aug 2020 17:38:12 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:58 CET jreher Updated APD location via API.
25. Nov 2019 17:17:14 CET jreher Updated box and position via API.
10. Sep 2019 11:20:35 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 10:44:02 CEST markus.moritz
25. Jul 2019 12:14:28 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:53 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:24 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:03:49 CEST Tobias Imported from Hamamatsu datasheet.