RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2707030550 - Archived data from Wed, 03. February 2021 18:24:01 CET


This is all the information about APD 2707030550. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2707030550
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2707030550/2419027406
Unit: #1171 (barcode 1309012909)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.7 V
Dark current: 7.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 79
Position in Box: 26
EP1 batch: 63
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.2859411 V     T = -25 °C: 346.1988493 V
Voltage for Gain 150: T = +20 °C: 389.1239691 V     T = -25 °C: 353.5660482 V
Voltage for Gain 200: T = +20 °C: 393.4993097 V     T = -25 °C: 357.6799042 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.523912526 V-1     T = -25 °C: 4.858502511 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.893563218 V-1     T = -25 °C: 9.026916369 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.51685802 V-1     T = -25 °C: 16.01043539 V-1
Break-through voltage: T = +20 °C: 409.0160786 V     T = -25 °C: 372.8064363 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:31 CET jreher Updated box and position via API.
03. Feb 2021 18:24:01 CET jreher Updated box and position via API.
11. Aug 2020 17:38:07 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:01:54 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:24 CET jreher Updated box and position via API.
27. Nov 2019 19:42:48 CET jreher Updated APD location via API.
25. Nov 2019 17:17:11 CET jreher Updated box and position via API.
10. Sep 2019 11:19:59 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 10:28:28 CEST markus.moritz
25. Jul 2019 12:14:41 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:47 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:23 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:03:35 CEST Tobias Imported from Hamamatsu datasheet.