RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0802007352 - Archived data from Wed, 21. April 2021 13:59:46 CEST


This is all the information about APD 0802007352. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0802007352
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G13
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 395.9 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 190
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 395.5947169 V     T = -25 °C: 359.1227162 V
Voltage for Gain 150: T = +20 °C: 403.4623238 V     T = -25 °C: 366.8646582 V
Voltage for Gain 200: T = +20 °C: 407.8061251 V     T = -25 °C: 371.1807602 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.365398833 V-1     T = -25 °C: 4.627873474 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.557591617 V-1     T = -25 °C: 9.179912766 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.8657223 V-1     T = -25 °C: 14.37567939 V-1
Break-through voltage: T = +20 °C: 420.3366822 V     T = -25 °C: 387.0689725 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:03:43 CEST jreher Updated box and position via API.
21. Apr 2021 13:59:46 CEST jreher Updated box and position via API.
05. Feb 2021 11:12:50 CET jreher Updated box and position via API.
11. Aug 2020 17:34:49 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:02:39 CET jreher Updated APD location via API.
25. Nov 2019 17:25:50 CET jreher Updated box and position via API.
16. Aug 2019 10:43:31 CEST spankonin Updated APD batch assignment via API.
13. Aug 2019 12:17:28 CEST jreher Updated APD location via API.
09. Aug 2019 17:00:09 CEST spankonin Updated APD batch assignment via API.
09. Aug 2019 11:41:57 CEST markus.moritz
22. Jun 2016 15:22:35 CEST Tobias Imported from Hamamatsu datasheet.