RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2707030543 - Archived data from Tue, 11. August 2020 17:38:06 CEST


This is all the information about APD 2707030543. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2707030543
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2707030543/2513028525
Unit: #1250 (barcode 1309013753)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D12
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.1 V
Dark current: 9.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 79
Position in Box: 19
EP1 batch: 63
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.3753691 V     T = -25 °C: 348.6831034 V
Voltage for Gain 150: T = +20 °C: 392.2132407 V     T = -25 °C: 356.1087561 V
Voltage for Gain 200: T = +20 °C: 396.5615652 V     T = -25 °C: 360.2841766 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.479663339 V-1     T = -25 °C: 5.016881982 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.758321191 V-1     T = -25 °C: 9.301636069 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.29673008 V-1     T = -25 °C: 14.55749508 V-1
Break-through voltage: T = +20 °C: 411.5469101 V     T = -25 °C: 375.2137698 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:30 CET jreher Updated box and position via API.
03. Feb 2021 18:24:00 CET jreher Updated box and position via API.
11. Aug 2020 17:38:06 CEST jreher Updated APD characteristics via API.
25. Jun 2020 11:14:26 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:41 CET jreher Updated box and position via API.
27. Nov 2019 19:42:48 CET jreher Updated APD location via API.
25. Nov 2019 17:17:10 CET jreher Updated box and position via API.
10. Sep 2019 11:19:58 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 10:23:47 CEST markus.moritz
25. Jul 2019 12:14:41 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:46 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:23 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:03:30 CEST Tobias Imported from Hamamatsu datasheet.