RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2707030523 - Archived data from Wed, 03. February 2021 18:23:59 CET


This is all the information about APD 2707030523. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2707030523
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.1 V
Dark current: 5.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 79
Position in Box: 9
EP1 batch: 63
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.0532385 V     T = -25 °C: 345.9058768 V
Voltage for Gain 150: T = +20 °C: 388.8931431 V     T = -25 °C: 353.260079 V
Voltage for Gain 200: T = +20 °C: 393.2689071 V     T = -25 °C: 357.3985413 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.617455956 V-1     T = -25 °C: 4.992993298 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.103740247 V-1     T = -25 °C: 9.327247073 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.15806541 V-1     T = -25 °C: 14.69144628 V-1
Break-through voltage: T = +20 °C: 408.7689151 V     T = -25 °C: 372.6783457 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:19:22 CET jreher Assigned to capsule by script
05. Feb 2021 10:58:29 CET jreher Updated box and position via API.
03. Feb 2021 18:23:59 CET jreher Updated box and position via API.
18. Dec 2020 14:01:32 CET jreher Updated box and position via API.
11. Aug 2020 17:38:04 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:47 CET jreher Updated APD location via API.
25. Nov 2019 17:17:09 CET jreher Updated box and position via API.
10. Sep 2019 11:19:57 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 10:19:41 CEST markus.moritz
25. Jul 2019 12:14:40 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:45 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:23 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:03:26 CEST Tobias Imported from Hamamatsu datasheet.