RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2706030462 - Archived data from Tue, 11. August 2020 17:38:02 CEST


This is all the information about APD 2706030462. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2706030462
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Giessen
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.8 V
Dark current: 7.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 78
Position in Box: 34
EP1 batch: 62
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.9945229 V     T = -25 °C: 348.537945 V
Voltage for Gain 150: T = +20 °C: 391.842551 V     T = -25 °C: 355.9628515 V
Voltage for Gain 200: T = +20 °C: 396.2030383 V     T = -25 °C: 360.1260592 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.611736845 V-1     T = -25 °C: 4.716174509 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.199171168 V-1     T = -25 °C: 9.544247992 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.28574391 V-1     T = -25 °C: 15.02462836 V-1
Break-through voltage: T = +20 °C: 410.977044 V     T = -25 °C: 374.9084504 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:24 CET jreher Updated box and position via API.
03. Feb 2021 18:23:54 CET jreher Updated box and position via API.
11. Aug 2020 17:54:54 CEST jreher Updated APD location via API.
11. Aug 2020 17:38:02 CEST jreher Updated APD characteristics via API.
29. Nov 2019 11:50:24 CET jreher Updated APD location via API.
27. Nov 2019 19:42:38 CET jreher Updated APD location via API.
25. Nov 2019 17:17:07 CET jreher Updated box and position via API.
10. Sep 2019 11:19:56 CEST jgrochowski Updated APD batch assignment via API.
03. Sep 2019 15:20:58 CEST markus.moritz
08. Jul 2019 14:56:47 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:39 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:22 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:03:16 CEST Tobias Imported from Hamamatsu datasheet.