RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2706030415 - Archived data from Mon, 10. May 2021 14:01:38 CEST


This is all the information about APD 2706030415. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2706030415
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D01
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387.9 V
Dark current: 11.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 78
Position in Box: 1
EP1 batch: 61
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.7099714 V     T = -25 °C: 351.8241154 V
Voltage for Gain 150: T = +20 °C: 395.5796258 V     T = -25 °C: 359.3673584 V
Voltage for Gain 200: T = +20 °C: 399.9340245 V     T = -25 °C: 363.6005608 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.362983223 V-1     T = -25 °C: 4.909619419 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.477111214 V-1     T = -25 °C: 8.978531755 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.73142929 V-1     T = -25 °C: 15.86393766 V-1
Break-through voltage: T = +20 °C: 413.9911981 V     T = -25 °C: 378.1851831 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:17:03 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:01:38 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:58:20 CET jreher Updated box and position via API.
03. Feb 2021 18:23:51 CET jreher Updated box and position via API.
11. Aug 2020 17:54:51 CEST jreher Updated APD location via API.
11. Aug 2020 17:37:56 CEST jreher Updated APD characteristics via API.
29. Nov 2019 11:50:21 CET jreher Updated APD location via API.
27. Nov 2019 19:42:35 CET jreher Updated APD location via API.
25. Nov 2019 17:17:04 CET jreher Updated box and position via API.
06. Sep 2019 13:13:17 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 14:50:03 CEST markus.moritz
08. Jul 2019 14:56:28 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:37 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:20 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:03:03 CEST Tobias Imported from Hamamatsu datasheet.