RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2705030393 - Archived data from Wed, 03. February 2021 18:23:48 CET


This is all the information about APD 2705030393. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2705030393
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F12
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 385.6 V
Dark current: 10.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 77
Position in Box: 42
EP1 batch: 61
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.0307573 V     T = -25 °C: 349.2686797 V
Voltage for Gain 150: T = +20 °C: 392.8302861 V     T = -25 °C: 356.7182683 V
Voltage for Gain 200: T = +20 °C: 397.1634562 V     T = -25 °C: 360.8833074 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.600123516 V-1     T = -25 °C: 4.776093524 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.195485806 V-1     T = -25 °C: 9.712299171 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.42081465 V-1     T = -25 °C: 15.51727846 V-1
Break-through voltage: T = +20 °C: 411.6460417 V     T = -25 °C: 375.5963496 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:15 CET jreher Updated box and position via API.
03. Feb 2021 18:23:48 CET jreher Updated box and position via API.
11. Aug 2020 17:37:54 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:27 CET jreher Updated APD location via API.
25. Nov 2019 17:17:02 CET jreher Updated box and position via API.
06. Sep 2019 13:13:17 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 14:47:09 CEST markus.moritz
08. Jul 2019 14:56:28 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:32 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:20 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:59 CEST Tobias Imported from Hamamatsu datasheet.