RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2705030383 - Archived data from Wed, 03. February 2021 18:23:47 CET


This is all the information about APD 2705030383. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2705030383
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.6 V
Dark current: 10.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 77
Position in Box: 33
EP1 batch: 61
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.4643039 V     T = -25 °C: 345.9662633 V
Voltage for Gain 150: T = +20 °C: 389.2963783 V     T = -25 °C: 353.3525117 V
Voltage for Gain 200: T = +20 °C: 393.6515338 V     T = -25 °C: 357.4902072 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.439895323 V-1     T = -25 °C: 4.936713265 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.726659227 V-1     T = -25 °C: 9.154782389 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.21383238 V-1     T = -25 °C: 16.32474581 V-1
Break-through voltage: T = +20 °C: 409.0009566 V     T = -25 °C: 372.5653416 V
   
Notes:


Version history

Time Author Change comment
25. Oct 2021 14:14:17 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:08 CEST jreher Updated box and position via API.
05. Feb 2021 10:58:14 CET jreher Updated box and position via API.
03. Feb 2021 18:23:47 CET jreher Updated box and position via API.
11. Aug 2020 17:37:53 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:26 CET jreher Updated APD location via API.
25. Nov 2019 17:17:02 CET jreher Updated box and position via API.
06. Sep 2019 13:13:16 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 14:39:37 CEST markus.moritz
08. Jul 2019 14:56:27 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:31 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:20 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:55 CEST Tobias Imported from Hamamatsu datasheet.