RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2705030378 - Archived data from Wed, 03. February 2021 18:23:46 CET


This is all the information about APD 2705030378. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2705030378
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2418027313/2705030378
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.3 V
Dark current: 11.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 77
Position in Box: 30
EP1 batch: 61
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.5267121 V     T = -25 °C: 347.8528626 V
Voltage for Gain 150: T = +20 °C: 391.4110992 V     T = -25 °C: 355.2787036 V
Voltage for Gain 200: T = +20 °C: 395.7824716 V     T = -25 °C: 359.4576785 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.41486205 V-1     T = -25 °C: 4.889331005 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.544746538 V-1     T = -25 °C: 9.165523747 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.77399138 V-1     T = -25 °C: 16.18485035 V-1
Break-through voltage: T = +20 °C: 411.5461094 V     T = -25 °C: 375.0073319 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:13 CET jreher Updated box and position via API.
03. Feb 2021 18:23:46 CET jreher Updated box and position via API.
08. Dec 2020 17:07:01 CET jreher Assigned to capsule by script
17. Aug 2020 16:01:01 CEST vwerner Updated box and position via API.
11. Aug 2020 17:37:52 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:26 CET jreher Updated APD location via API.
25. Nov 2019 17:17:02 CET jreher Updated box and position via API.
06. Sep 2019 13:13:16 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 14:38:09 CEST markus.moritz
08. Jul 2019 14:56:27 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:31 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:20 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:55 CEST Tobias Imported from Hamamatsu datasheet.