RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2705030377 - Archived data from Wed, 07. October 2020 12:16:37 CEST


This is all the information about APD 2705030377. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2705030377
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2303024342/2705030377
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.5 V
Dark current: 11.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 77
Position in Box: 29
EP1 batch: 61
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.6058159 V     T = -25 °C: 346.9386811 V
Voltage for Gain 150: T = +20 °C: 390.4830767 V     T = -25 °C: 354.3695467 V
Voltage for Gain 200: T = +20 °C: 394.8570518 V     T = -25 °C: 358.5384215 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.401321621 V-1     T = -25 °C: 4.911461732 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.513148329 V-1     T = -25 °C: 9.097843019 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.70297257 V-1     T = -25 °C: 15.9982276 V-1
Break-through voltage: T = +20 °C: 410.8181284 V     T = -25 °C: 374.2261764 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:13 CET jreher Updated box and position via API.
03. Feb 2021 18:23:46 CET jreher Updated box and position via API.
07. Oct 2020 12:16:37 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:14 CEST jreher Updated box and position via API.
11. Aug 2020 17:37:52 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:32:26 CET jreher Updated box and position via API.
27. Nov 2019 19:42:26 CET jreher Updated APD location via API.
25. Nov 2019 17:17:01 CET jreher Updated box and position via API.
06. Sep 2019 13:13:16 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 14:37:44 CEST markus.moritz
08. Jul 2019 14:56:27 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:31 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:20 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:54 CEST Tobias Imported from Hamamatsu datasheet.