Show Hamamatsu Avalanche Photo Diode 2705030363 - Archived data from Tue, 11. August 2020 17:37:50 CEST


This is all the information about APD 2705030363. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2705030363
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.8 V
Dark current: 8.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 77
Position in Box: 19
EP1 batch: 60
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.7109585 V     T = -25 °C: 351.0253397 V
Voltage for Gain 150: T = +20 °C: 394.5486637 V     T = -25 °C: 358.5119052 V
Voltage for Gain 200: T = +20 °C: 398.8861865 V     T = -25 °C: 362.6887408 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.374883746 V-1     T = -25 °C: 4.863878522 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.556575675 V-1     T = -25 °C: 8.902641258 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.83618904 V-1     T = -25 °C: 15.79482725 V-1
Break-through voltage: T = +20 °C: 412.9327501 V     T = -25 °C: 376.868735 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:12 CET jreher Updated box and position via API.
03. Feb 2021 18:23:45 CET jreher Updated box and position via API.
11. Aug 2020 17:37:50 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:25 CET jreher Updated APD location via API.
25. Nov 2019 17:17:01 CET jreher Updated box and position via API.
06. Sep 2019 13:12:51 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 14:30:32 CEST markus.moritz
08. Jul 2019 14:56:12 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:30 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:19 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:50 CEST Tobias Imported from Hamamatsu datasheet.