RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2705030358 - Archived data from Tue, 11. August 2020 17:37:49 CEST


This is all the information about APD 2705030358. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2705030358
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A09
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 389.8 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 77
Position in Box: 15
EP1 batch: 60
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 390.4558964 V     T = -25 °C: 354.3468376 V
Voltage for Gain 150: T = +20 °C: 398.3439115 V     T = -25 °C: 361.9470801 V
Voltage for Gain 200: T = +20 °C: 402.7189072 V     T = -25 °C: 366.2084192 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.455957518 V-1     T = -25 °C: 4.655296602 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.627414155 V-1     T = -25 °C: 9.233113923 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.99214457 V-1     T = -25 °C: 14.51469053 V-1
Break-through voltage: T = +20 °C: 417.2590172 V     T = -25 °C: 381.0280237 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:12 CET jreher Updated box and position via API.
03. Feb 2021 18:23:44 CET jreher Updated box and position via API.
11. Aug 2020 17:37:49 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:25 CET jreher Updated APD location via API.
25. Nov 2019 17:17:00 CET jreher Updated box and position via API.
06. Sep 2019 13:12:51 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 14:28:58 CEST markus.moritz
08. Jul 2019 14:56:12 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:29 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:19 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:48 CEST Tobias Imported from Hamamatsu datasheet.