RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2705030343 - Archived data from Wed, 03. February 2021 18:23:43 CET


This is all the information about APD 2705030343. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2705030343
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.5 V
Dark current: 10.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 77
Position in Box: 3
EP1 batch: 60
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.6073067 V     T = -25 °C: 345.2397646 V
Voltage for Gain 150: T = +20 °C: 388.4942882 V     T = -25 °C: 352.6807007 V
Voltage for Gain 200: T = +20 °C: 392.8862161 V     T = -25 °C: 356.8510526 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.402592823 V-1     T = -25 °C: 4.816006254 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.496963668 V-1     T = -25 °C: 9.69912387 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.58735343 V-1     T = -25 °C: 15.40881236 V-1
Break-through voltage: T = +20 °C: 408.6168997 V     T = -25 °C: 372.4475228 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:10 CET jreher Updated box and position via API.
03. Feb 2021 18:23:43 CET jreher Updated box and position via API.
11. Aug 2020 17:37:47 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:24 CET jreher Updated APD location via API.
25. Nov 2019 17:16:59 CET jreher Updated box and position via API.
06. Sep 2019 13:12:50 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 14:22:01 CEST markus.moritz
08. Jul 2019 14:56:11 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:28 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:19 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:41 CEST Tobias Imported from Hamamatsu datasheet.