RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2705030335 - Archived data from Wed, 03. February 2021 18:23:41 CET


This is all the information about APD 2705030335. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2705030335
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A06
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387 V
Dark current: 7.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 76
Position in Box: 48
EP1 batch: 60
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.1896049 V     T = -25 °C: 351.2095465 V
Voltage for Gain 150: T = +20 °C: 395.1339187 V     T = -25 °C: 358.7760055 V
Voltage for Gain 200: T = +20 °C: 399.5553566 V     T = -25 °C: 363.0130751 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.497727971 V-1     T = -25 °C: 4.732693302 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.780965466 V-1     T = -25 °C: 9.496018954 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.28875757 V-1     T = -25 °C: 14.95472058 V-1
Break-through voltage: T = +20 °C: 414.4896292 V     T = -25 °C: 378.3830096 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:08 CET jreher Updated box and position via API.
03. Feb 2021 18:23:41 CET jreher Updated box and position via API.
11. Aug 2020 17:37:46 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:16 CET jreher Updated APD location via API.
25. Nov 2019 17:16:58 CET jreher Updated box and position via API.
06. Sep 2019 13:12:50 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 14:18:57 CEST markus.moritz
08. Jul 2019 14:56:10 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:24 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:18 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:40 CEST Tobias Imported from Hamamatsu datasheet.