RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2705030329 - Archived data from Wed, 03. February 2021 18:23:40 CET


This is all the information about APD 2705030329. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2705030329
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2309024887/2705030329
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 381.9 V
Dark current: 9.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 76
Position in Box: 42
EP1 batch: 59
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7837261 V     T = -25 °C: 346.2429969 V
Voltage for Gain 150: T = +20 °C: 389.6476254 V     T = -25 °C: 353.6634858 V
Voltage for Gain 200: T = +20 °C: 394.0260946 V     T = -25 °C: 357.8165939 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.660995105 V-1     T = -25 °C: 4.788515236 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.213309089 V-1     T = -25 °C: 9.751828632 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.32683523 V-1     T = -25 °C: 15.45799621 V-1
Break-through voltage: T = +20 °C: 409.8973518 V     T = -25 °C: 373.3467541 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:07 CET jreher Updated box and position via API.
03. Feb 2021 18:23:40 CET jreher Updated box and position via API.
11. Aug 2020 17:37:45 CEST jreher Updated APD characteristics via API.
25. Jun 2020 11:26:02 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:35 CET jreher Updated box and position via API.
27. Nov 2019 19:42:16 CET jreher Updated APD location via API.
25. Nov 2019 17:16:58 CET jreher Updated box and position via API.
06. Sep 2019 13:12:49 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 14:07:15 CEST markus.moritz
08. Jul 2019 14:55:57 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:23 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:18 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:39 CEST Tobias Imported from Hamamatsu datasheet.