RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2705030328 - Archived data from Tue, 11. August 2020 17:37:44 CEST


This is all the information about APD 2705030328. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2705030328
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C02
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.1 V
Dark current: 9.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 76
Position in Box: 41
EP1 batch: 59
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.640121 V     T = -25 °C: 346.2201388 V
Voltage for Gain 150: T = +20 °C: 389.5666839 V     T = -25 °C: 353.6757809 V
Voltage for Gain 200: T = +20 °C: 393.9787255 V     T = -25 °C: 357.8561878 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.358630748 V-1     T = -25 °C: 4.803639098 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.243672974 V-1     T = -25 °C: 9.717258897 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.34007653 V-1     T = -25 °C: 15.43343085 V-1
Break-through voltage: T = +20 °C: 409.9990056 V     T = -25 °C: 373.5200701 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:07 CET jreher Updated box and position via API.
03. Feb 2021 18:23:40 CET jreher Updated box and position via API.
11. Aug 2020 17:37:44 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:16 CET jreher Updated APD location via API.
25. Nov 2019 17:16:58 CET jreher Updated box and position via API.
06. Sep 2019 13:12:49 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 14:06:55 CEST markus.moritz
08. Jul 2019 14:55:57 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:23 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:18 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:39 CEST Tobias Imported from Hamamatsu datasheet.