RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2704030309 - Archived data from Wed, 03. February 2021 18:23:39 CET


This is all the information about APD 2704030309. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2704030309
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.5 V
Dark current: 10.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 76
Position in Box: 36
EP1 batch: 59
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.6243492 V     T = -25 °C: 350.9669202 V
Voltage for Gain 150: T = +20 °C: 394.452106 V     T = -25 °C: 358.4104076 V
Voltage for Gain 200: T = +20 °C: 398.7796544 V     T = -25 °C: 362.5627737 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.397048878 V-1     T = -25 °C: 4.887175882 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.54497123 V-1     T = -25 °C: 8.958906352 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.79435126 V-1     T = -25 °C: 15.70263841 V-1
Break-through voltage: T = +20 °C: 413.6500836 V     T = -25 °C: 377.3758251 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:07 CET jreher Updated box and position via API.
03. Feb 2021 18:23:39 CET jreher Updated box and position via API.
11. Aug 2020 17:37:44 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:15 CET jreher Updated APD location via API.
25. Nov 2019 17:16:57 CET jreher Updated box and position via API.
06. Sep 2019 13:12:09 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 12:31:20 CEST markus.moritz
08. Jul 2019 14:55:57 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:23 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:18 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:39 CEST Tobias Imported from Hamamatsu datasheet.