RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2704030276 - Archived data from Wed, 03. February 2021 18:23:38 CET


This is all the information about APD 2704030276. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2704030276
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2704030276/2513028520
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F12
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 381.5 V
Dark current: 19.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 76
Position in Box: 23
EP1 batch: 59
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.3635219 V     T = -25 °C: 346.0465807 V
Voltage for Gain 150: T = +20 °C: 389.191325 V     T = -25 °C: 353.4218127 V
Voltage for Gain 200: T = +20 °C: 393.5580784 V     T = -25 °C: 357.5649857 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.500902484 V-1     T = -25 °C: 4.920807114 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.848908383 V-1     T = -25 °C: 9.11635951 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.43544202 V-1     T = -25 °C: 16.21488337 V-1
Break-through voltage: T = +20 °C: 408.7964306 V     T = -25 °C: 372.786962 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:05 CET jreher Updated box and position via API.
03. Feb 2021 18:23:38 CET jreher Updated box and position via API.
11. Aug 2020 17:37:42 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:01:09 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:12 CET jreher Updated box and position via API.
27. Nov 2019 19:42:15 CET jreher Updated APD location via API.
25. Nov 2019 17:16:56 CET jreher Updated box and position via API.
06. Sep 2019 13:12:08 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 12:20:58 CEST markus.moritz
08. Jul 2019 14:55:56 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:22 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:17 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:32 CEST Tobias Imported from Hamamatsu datasheet.