RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2704030252 - Archived data from Wed, 03. February 2021 18:23:36 CET


This is all the information about APD 2704030252. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2704030252
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 385.9 V
Dark current: 13.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 76
Position in Box: 6
EP1 batch: 58
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.1364017 V     T = -25 °C: 350.6984731 V
Voltage for Gain 150: T = +20 °C: 393.983479 V     T = -25 °C: 358.154801 V
Voltage for Gain 200: T = +20 °C: 398.3503842 V     T = -25 °C: 362.4365979 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.572204658 V-1     T = -25 °C: 4.747244412 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.046246084 V-1     T = -25 °C: 9.295006374 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.02951004 V-1     T = -25 °C: 13.13201307 V-1
Break-through voltage: T = +20 °C: 413.63688 V     T = -25 °C: 377.5761375 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:03 CET jreher Updated box and position via API.
03. Feb 2021 18:23:36 CET jreher Updated box and position via API.
11. Aug 2020 17:37:38 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:13 CET jreher Updated APD location via API.
25. Nov 2019 17:16:55 CET jreher Updated box and position via API.
06. Sep 2019 13:11:43 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 12:01:06 CEST markus.moritz
08. Jul 2019 14:55:42 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:21 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:17 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:24 CEST Tobias Imported from Hamamatsu datasheet.