RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0802007335 - Archived data from Mon, 17. August 2020 15:53:51 CEST


This is all the information about APD 0802007335. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0802007335
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 420 V
Voltage for Gain 100 (T=+25°C): 391.4 V
Dark current: 2.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 182
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.8586677 V     T = -25 °C: 355.3704445 V
Voltage for Gain 150: T = +20 °C: 399.7096648 V     T = -25 °C: 363.0282602 V
Voltage for Gain 200: T = +20 °C: 404.0429579 V     T = -25 °C: 367.3110858 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.668285442 V-1     T = -25 °C: 4.669556075 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.521250315 V-1     T = -25 °C: 9.255851331 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.96068865 V-1     T = -25 °C: 14.62582106 V-1
Break-through voltage: T = +20 °C: 419.41245 V     T = -25 °C: 383.4763774 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:11:47 CET jreher Updated box and position via API.
07. Oct 2020 14:22:33 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:51 CEST jreher Updated box and position via API.
11. Aug 2020 17:30:06 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:01:12 CET jreher Updated APD location via API.
25. Nov 2019 17:25:13 CET jreher Updated box and position via API.
13. Aug 2019 12:19:54 CEST jreher Updated APD location via API.
22. Jul 2019 10:51:42 CEST spankonin Updated APD batch assignment via API.
10. Jul 2019 12:19:58 CEST markus.moritz
22. Jun 2016 15:22:34 CEST Tobias Imported from Hamamatsu datasheet.