RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2703030226 - Archived data from Mon, 17. August 2020 15:50:35 CEST


This is all the information about APD 2703030226. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2703030226
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.8 V
Dark current: 9.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 75
Position in Box: 47
EP1 batch: 58
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.842182 V     T = -25 °C: 343.5926592 V
Voltage for Gain 150: T = +20 °C: 386.6734475 V     T = -25 °C: 351.0052086 V
Voltage for Gain 200: T = +20 °C: 391.0358559 V     T = -25 °C: 355.1463399 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.672490584 V-1     T = -25 °C: 4.720331255 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.248989027 V-1     T = -25 °C: 9.442898012 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.38391118 V-1     T = -25 °C: 15.03394537 V-1
Break-through voltage: T = +20 °C: 406.7095565 V     T = -25 °C: 370.5089928 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:00 CET jreher Updated box and position via API.
03. Feb 2021 18:23:33 CET jreher Updated box and position via API.
07. Oct 2020 12:26:24 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:35 CEST jreher Updated box and position via API.
11. Aug 2020 17:37:37 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:34:54 CET jreher Updated box and position via API.
27. Nov 2019 19:42:05 CET jreher Updated APD location via API.
25. Nov 2019 17:16:53 CET jreher Updated box and position via API.
06. Sep 2019 13:11:43 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 11:58:01 CEST markus.moritz
08. Jul 2019 14:55:41 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:16 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:17 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:21 CEST Tobias Imported from Hamamatsu datasheet.