RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2703030196 - Archived data from Wed, 07. October 2020 12:19:30 CEST


This is all the information about APD 2703030196. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2703030196
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2703030196/0820008762
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.6 V
Dark current: 16.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 75
Position in Box: 26
EP1 batch: 57
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.3497885 V     T = -25 °C: 343.5565914 V
Voltage for Gain 150: T = +20 °C: 386.1745777 V     T = -25 °C: 350.8561864 V
Voltage for Gain 200: T = +20 °C: 390.5454001 V     T = -25 °C: 354.9391072 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.507083556 V-1     T = -25 °C: 4.784595658 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.811613658 V-1     T = -25 °C: 9.755520436 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.33807107 V-1     T = -25 °C: 15.57151679 V-1
Break-through voltage: T = +20 °C: 406.1493182 V     T = -25 °C: 370.0121103 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:57 CET jreher Updated box and position via API.
03. Feb 2021 18:23:30 CET jreher Updated box and position via API.
07. Oct 2020 12:19:30 CEST jreher Assigned to capsule by script
06. Oct 2020 16:52:56 CEST jreher Updated box and position via API.
11. Aug 2020 17:37:33 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:04 CET jreher Updated APD location via API.
25. Nov 2019 17:16:52 CET jreher Updated box and position via API.
06. Sep 2019 13:11:23 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 11:40:49 CEST markus.moritz
08. Jul 2019 14:55:25 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:14 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:16 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:17 CEST Tobias Imported from Hamamatsu datasheet.