RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2703030180 - Archived data from Fri, 05. February 2021 10:57:56 CET


This is all the information about APD 2703030180. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2703030180
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.7 V
Dark current: 16.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 178
Position in Box: 34
EP1 batch: 57
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.2739159 V     T = -25 °C: 349.6134849 V
Voltage for Gain 150: T = +20 °C: 393.1477821 V     T = -25 °C: 357.0695195 V
Voltage for Gain 200: T = +20 °C: 397.5196483 V     T = -25 °C: 361.2628143 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.494903971 V-1     T = -25 °C: 4.627002921 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.807395255 V-1     T = -25 °C: 9.291674607 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.46779149 V-1     T = -25 °C: 14.64613958 V-1
Break-through voltage: T = +20 °C: 411.1784329 V     T = -25 °C: 375.0350567 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:24:49 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:57:56 CET jreher Updated box and position via API.
03. Feb 2021 18:23:29 CET jreher Updated box and position via API.
11. Aug 2020 17:37:30 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:42:03 CET jreher Updated APD location via API.
25. Nov 2019 17:16:51 CET jreher Updated box and position via API.
06. Sep 2019 13:11:22 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 11:29:57 CEST markus.moritz
08. Jul 2019 14:55:24 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:13 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:15 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:10 CEST Tobias Imported from Hamamatsu datasheet.