RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2703030161 - Archived data from Tue, 11. August 2020 17:37:28 CEST


This is all the information about APD 2703030161. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2703030161
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2703030161/2305024531
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C03
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 380.8 V
Dark current: 7.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 74
Position in Box: 49
EP1 batch: 56
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9311264 V     T = -25 °C: 345.8986889 V
Voltage for Gain 150: T = +20 °C: 388.8329573 V     T = -25 °C: 353.2902778 V
Voltage for Gain 200: T = +20 °C: 393.2419773 V     T = -25 °C: 357.4507474 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.617810208 V-1     T = -25 °C: 4.969504894 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.056620049 V-1     T = -25 °C: 9.20046741 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.0568894 V-1     T = -25 °C: 14.47895535 V-1
Break-through voltage: T = +20 °C: 409.0829038 V     T = -25 °C: 372.921697 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:52 CET jreher Updated box and position via API.
03. Feb 2021 18:23:25 CET jreher Updated box and position via API.
11. Aug 2020 17:37:28 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:44:51 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:36 CET jreher Updated box and position via API.
27. Nov 2019 19:41:54 CET jreher Updated APD location via API.
25. Nov 2019 17:16:49 CET jreher Updated box and position via API.
06. Sep 2019 13:11:21 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 11:22:35 CEST markus.moritz
08. Jul 2019 14:55:10 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:08 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:15 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:07 CEST Tobias Imported from Hamamatsu datasheet.