RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2702030100 - Archived data from Wed, 03. February 2021 18:23:23 CET


This is all the information about APD 2702030100. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2702030100
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.7 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 74
Position in Box: 32
EP1 batch: 56
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.3970145 V     T = -25 °C: 349.0591984 V
Voltage for Gain 150: T = +20 °C: 393.2133872 V     T = -25 °C: 356.5887975 V
Voltage for Gain 200: T = +20 °C: 397.5448445 V     T = -25 °C: 360.7994282 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.464256307 V-1     T = -25 °C: 4.822154295 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.769409911 V-1     T = -25 °C: 9.671830222 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.32465 V-1     T = -25 °C: 15.33881048 V-1
Break-through voltage: T = +20 °C: 412.5614621 V     T = -25 °C: 375.8884731 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:23:57 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:01:51 CEST jreher Updated box and position via API.
05. Feb 2021 10:57:51 CET jreher Updated box and position via API.
03. Feb 2021 18:23:23 CET jreher Updated box and position via API.
11. Aug 2020 17:37:24 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:53 CET jreher Updated APD location via API.
25. Nov 2019 17:16:47 CET jreher Updated box and position via API.
06. Sep 2019 13:10:54 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 10:46:05 CEST markus.moritz
08. Jul 2019 14:55:09 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:07 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:14 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:02:00 CEST Tobias Imported from Hamamatsu datasheet.