RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2702030088 - Archived data from Wed, 27. November 2019 19:41:52 CET


This is all the information about APD 2702030088. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2702030088
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387.1 V
Dark current: 8.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 74
Position in Box: 21
EP1 batch: 55
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:49 CET jreher Updated box and position via API.
03. Feb 2021 18:23:22 CET jreher Updated box and position via API.
11. Aug 2020 17:37:22 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:52 CET jreher Updated APD location via API.
25. Nov 2019 17:16:47 CET jreher Updated box and position via API.
06. Sep 2019 13:10:53 CEST spankonin Updated APD batch assignment via API.
03. Sep 2019 10:36:43 CEST markus.moritz
08. Jul 2019 14:54:42 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:06 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:14 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:55 CEST Tobias Imported from Hamamatsu datasheet.