RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2701030062 - Archived data from Wed, 03. February 2021 18:23:20 CET


This is all the information about APD 2701030062. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2701030062
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2701030062/0812008090
Unit: #1167 (barcode 1309012701)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.7 V
Dark current: 9.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 74
Position in Box: 7
EP1 batch: 55
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7070255 V     T = -25 °C: 346.1842307 V
Voltage for Gain 150: T = +20 °C: 389.5135767 V     T = -25 °C: 353.5504048 V
Voltage for Gain 200: T = +20 °C: 393.8482156 V     T = -25 °C: 357.6497673 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.411910795 V-1     T = -25 °C: 4.890009745 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.552685656 V-1     T = -25 °C: 8.99662389 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.93282629 V-1     T = -25 °C: 16.21823393 V-1
Break-through voltage: T = +20 °C: 409.5865425 V     T = -25 °C: 372.8798735 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:48 CET jreher Updated box and position via API.
03. Feb 2021 18:23:20 CET jreher Updated box and position via API.
11. Aug 2020 17:37:20 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:01:34 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:10 CET jreher Updated box and position via API.
27. Nov 2019 19:41:51 CET jreher Updated APD location via API.
25. Nov 2019 17:16:46 CET jreher Updated box and position via API.
06. Sep 2019 13:10:25 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 15:16:30 CEST markus.moritz
08. Jul 2019 14:54:41 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:05 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:13 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:51 CEST Tobias Imported from Hamamatsu datasheet.