RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2701030058 - Archived data from Wed, 03. February 2021 18:23:20 CET


This is all the information about APD 2701030058. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2701030058
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.8 V
Dark current: 7.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 74
Position in Box: 3
EP1 batch: 55
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.2974425 V     T = -25 °C: 348.6088459 V
Voltage for Gain 150: T = +20 °C: 392.0723151 V     T = -25 °C: 355.9838248 V
Voltage for Gain 200: T = +20 °C: 396.3973883 V     T = -25 °C: 360.1226873 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.5567856 V-1     T = -25 °C: 4.733888316 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.029918257 V-1     T = -25 °C: 9.516169787 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.07852685 V-1     T = -25 °C: 15.07797612 V-1
Break-through voltage: T = +20 °C: 411.0852154 V     T = -25 °C: 374.585517 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:47 CET jreher Updated box and position via API.
03. Feb 2021 18:23:20 CET jreher Updated box and position via API.
11. Aug 2020 17:37:19 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:51 CET jreher Updated APD location via API.
25. Nov 2019 17:16:45 CET jreher Updated box and position via API.
06. Sep 2019 13:10:24 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 14:57:09 CEST markus.moritz
08. Jul 2019 14:54:41 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:05 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:13 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:50 CEST Tobias Imported from Hamamatsu datasheet.