RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2701030030 - Archived data from Wed, 03. February 2021 18:23:16 CET


This is all the information about APD 2701030030. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2701030030
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 8.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 73
Position in Box: 31
EP1 batch: 54
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.5860552 V     T = -25 °C: 346.38447 V
Voltage for Gain 150: T = +20 °C: 389.3983465 V     T = -25 °C: 353.7015752 V
Voltage for Gain 200: T = +20 °C: 393.7360509 V     T = -25 °C: 357.7897207 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.448067338 V-1     T = -25 °C: 4.832908871 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.648025867 V-1     T = -25 °C: 9.833529041 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.07314208 V-1     T = -25 °C: 15.84732325 V-1
Break-through voltage: T = +20 °C: 409.6212856 V     T = -25 °C: 373.1890259 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:43 CET jreher Updated box and position via API.
03. Feb 2021 18:23:16 CET jreher Updated box and position via API.
11. Aug 2020 17:37:15 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:42 CET jreher Updated APD location via API.
25. Nov 2019 17:16:43 CET jreher Updated box and position via API.
06. Sep 2019 13:10:04 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 14:28:35 CEST markus.moritz
08. Jul 2019 14:54:23 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:59 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:13 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:48 CEST Tobias Imported from Hamamatsu datasheet.