Subdetector specification:  
Serial: 2701030028
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2701030028/0803007398
Unit: #1200 (barcode 1309013197)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 381.9 V
Dark current: 8.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 73
Position in Box: 29
EP1 batch: 54
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.5251558 V     T = -25 °C: 346.9168042 V
Voltage for Gain 150: T = +20 °C: 390.3475981 V     T = -25 °C: 354.3153139 V
Voltage for Gain 200: T = +20 °C: 394.694062 V     T = -25 °C: 358.4551245 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.472827002 V-1     T = -25 °C: 4.954854598 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.695602389 V-1     T = -25 °C: 9.173798478 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.19892041 V-1     T = -25 °C: 16.48276505 V-1
Break-through voltage: T = +20 °C: 410.0652615 V     T = -25 °C: 373.5585094 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:42 CET jreher Updated box and position via API.
03. Feb 2021 18:23:15 CET jreher Updated box and position via API.
11. Aug 2020 17:37:15 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:06:40 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:28 CET jreher Updated box and position via API.
27. Nov 2019 19:41:42 CET jreher Updated APD location via API.
25. Nov 2019 17:16:43 CET jreher Updated box and position via API.
06. Sep 2019 13:10:04 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 14:27:24 CEST markus.moritz
08. Jul 2019 14:54:23 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:59 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:12 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".