RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2701030015 - Archived data from Wed, 03. February 2021 18:23:14 CET


This is all the information about APD 2701030015. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2701030015
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G04
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.7 V
Dark current: 7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 73
Position in Box: 17
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.6390348 V     T = -25 °C: 349.1113603 V
Voltage for Gain 150: T = +20 °C: 392.57037 V     T = -25 °C: 356.6329807 V
Voltage for Gain 200: T = +20 °C: 396.9879545 V     T = -25 °C: 360.8582593 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.537730247 V-1     T = -25 °C: 4.644330557 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.659036586 V-1     T = -25 °C: 9.014598608 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.44900575 V-1     T = -25 °C: 15.26974995 V-1
Break-through voltage: T = +20 °C: 412.631752 V     T = -25 °C: 376.1913185 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:57:41 CET jreher Updated box and position via API.
03. Feb 2021 18:23:14 CET jreher Updated box and position via API.
11. Aug 2020 17:27:08 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:41 CET jreher Updated APD location via API.
25. Nov 2019 17:16:42 CET jreher Updated box and position via API.
11. Nov 2019 16:23:52 CET jreher Updated APD location via API.
04. Jul 2019 11:11:46 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:43 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:39 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:12 CET Tobias Corrected dark current unit.
21. Aug 2018 10:56:43 CEST markus.moritz
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:46 CEST Tobias Imported from Hamamatsu datasheet.