RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2701030007 - Archived data from Wed, 12. June 2019 16:48:43 CEST


This is all the information about APD 2701030007. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2701030007
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D01
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387 V
Dark current: 6.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 73
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes: foam


Version history

Time Author Change comment
16. Nov 2021 10:41:38 CET oafedulidis Assigned to capsule by script
27. Aug 2021 10:31:10 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:57:40 CET jreher Updated box and position via API.
03. Feb 2021 18:23:13 CET jreher Updated box and position via API.
11. Aug 2020 17:27:07 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:40 CET jreher Updated APD location via API.
25. Nov 2019 17:16:41 CET jreher Updated box and position via API.
11. Nov 2019 16:23:52 CET jreher Updated APD location via API.
04. Jul 2019 11:11:46 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:43 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:39 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:11 CET Tobias Corrected dark current unit.
21. Aug 2018 10:52:17 CEST markus.moritz
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:45 CEST Tobias Imported from Hamamatsu datasheet.