RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2701029997 - Archived data from Mon, 17. August 2020 15:53:25 CEST


This is all the information about APD 2701029997. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2701029997
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 72
Position in Box: 49
EP1 batch: 54
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.3791646 V     T = -25 °C: 346.7120797 V
Voltage for Gain 150: T = +20 °C: 390.2294053 V     T = -25 °C: 354.1223591 V
Voltage for Gain 200: T = +20 °C: 394.5984004 V     T = -25 °C: 358.2809714 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.478100344 V-1     T = -25 °C: 4.999245328 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.747458611 V-1     T = -25 °C: 9.280350495 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.24665725 V-1     T = -25 °C: 14.70107111 V-1
Break-through voltage: T = +20 °C: 410.3025167 V     T = -25 °C: 373.7404762 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:37 CET jreher Updated box and position via API.
03. Feb 2021 18:23:10 CET jreher Updated box and position via API.
07. Oct 2020 12:12:56 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:25 CEST jreher Updated box and position via API.
11. Aug 2020 17:37:11 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:32 CET jreher Updated APD location via API.
25. Nov 2019 17:16:39 CET jreher Updated box and position via API.
06. Sep 2019 13:10:02 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 14:16:16 CEST markus.moritz
08. Jul 2019 14:54:22 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:53 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:11 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:41 CEST Tobias Imported from Hamamatsu datasheet.