RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2610029931 - Archived data from Tue, 11. August 2020 17:37:08 CEST


This is all the information about APD 2610029931. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2610029931
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A10
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 383 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 72
Position in Box: 28
EP1 batch: 53
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.8204178 V     T = -25 °C: 347.2993734 V
Voltage for Gain 150: T = +20 °C: 390.6749223 V     T = -25 °C: 354.7468117 V
Voltage for Gain 200: T = +20 °C: 395.0283486 V     T = -25 °C: 358.917597 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.678083273 V-1     T = -25 °C: 4.764008676 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.261520991 V-1     T = -25 °C: 9.670081307 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.52228404 V-1     T = -25 °C: 15.32188751 V-1
Break-through voltage: T = +20 °C: 409.6500646 V     T = -25 °C: 374.344557 V
   
Notes:


Version history

Time Author Change comment
20. Oct 2021 09:35:57 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:01:30 CEST jreher Updated box and position via API.
05. Feb 2021 10:57:35 CET jreher Updated box and position via API.
03. Feb 2021 18:23:08 CET jreher Updated box and position via API.
11. Aug 2020 17:37:08 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:31 CET jreher Updated APD location via API.
25. Nov 2019 17:16:38 CET jreher Updated box and position via API.
06. Sep 2019 13:09:38 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 12:36:56 CEST markus.moritz
08. Jul 2019 14:54:07 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:52 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:10 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:36 CEST Tobias Imported from Hamamatsu datasheet.