RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2610029927 - Archived data from Wed, 03. February 2021 18:23:07 CET


This is all the information about APD 2610029927. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2610029927
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C11
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 376.8 V
Dark current: 8.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 72
Position in Box: 24
EP1 batch: 53
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.9757032 V     T = -25 °C: 341.7950442 V
Voltage for Gain 150: T = +20 °C: 384.7638335 V     T = -25 °C: 349.1149693 V
Voltage for Gain 200: T = +20 °C: 389.1034685 V     T = -25 °C: 353.2222761 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.646644712 V-1     T = -25 °C: 5.058050925 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.247619182 V-1     T = -25 °C: 9.47594145 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.40749017 V-1     T = -25 °C: 14.9799424 V-1
Break-through voltage: T = +20 °C: 404.8448792 V     T = -25 °C: 368.5538962 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:34 CET jreher Updated box and position via API.
03. Feb 2021 18:23:07 CET jreher Updated box and position via API.
11. Aug 2020 17:37:07 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:30 CET jreher Updated APD location via API.
25. Nov 2019 17:16:37 CET jreher Updated box and position via API.
06. Sep 2019 13:09:37 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 12:31:41 CEST markus.moritz
08. Jul 2019 14:54:06 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:10 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:33 CEST Tobias Imported from Hamamatsu datasheet.