RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2610029923 - Archived data from Wed, 03. February 2021 18:23:07 CET


This is all the information about APD 2610029923. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2610029923
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2502027649/2610029923
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.8 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 72
Position in Box: 22
EP1 batch: 53
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.5254162 V     T = -25 °C: 345.2254447 V
Voltage for Gain 150: T = +20 °C: 388.3916624 V     T = -25 °C: 352.6294906 V
Voltage for Gain 200: T = +20 °C: 392.7657674 V     T = -25 °C: 356.7719455 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.456956366 V-1     T = -25 °C: 4.840919854 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.663501266 V-1     T = -25 °C: 9.899873184 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.03688181 V-1     T = -25 °C: 15.76293988 V-1
Break-through voltage: T = +20 °C: 407.577248 V     T = -25 °C: 371.6583814 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:34 CET jreher Updated box and position via API.
03. Feb 2021 18:23:07 CET jreher Updated box and position via API.
11. Aug 2020 17:37:07 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:06:37 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:27 CET jreher Updated box and position via API.
27. Nov 2019 19:41:30 CET jreher Updated APD location via API.
25. Nov 2019 17:16:37 CET jreher Updated box and position via API.
06. Sep 2019 13:09:37 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 12:28:34 CEST markus.moritz
08. Jul 2019 14:54:06 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:10 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:33 CEST Tobias Imported from Hamamatsu datasheet.