RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2610029923


This is all the information about APD 2610029923. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2610029923
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2502027649/2610029923
Unit: #1191 (barcode 1309013104)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.8 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 72
Position in Box: 22
EP1 batch: 53
EP1 batch after irradiation: 10169
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.5254162 V     T = -25 °C: 345.2254447 V
Voltage for Gain 150: T = +20 °C: 388.3916624 V     T = -25 °C: 352.6294906 V
Voltage for Gain 200: T = +20 °C: 392.7657674 V     T = -25 °C: 356.7719455 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.456956366 V-1     T = -25 °C: 4.840919854 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.663501266 V-1     T = -25 °C: 9.899873184 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.03688181 V-1     T = -25 °C: 15.76293988 V-1
Break-through voltage: T = +20 °C: 407.577248 V     T = -25 °C: 371.6583814 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
05. Feb 2021 10:57:34 CET jreher Updated box and position via API.
03. Feb 2021 18:23:07 CET jreher Updated box and position via API.
11. Aug 2020 17:37:07 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:06:37 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:27 CET jreher Updated box and position via API.
27. Nov 2019 19:41:30 CET jreher Updated APD location via API.
25. Nov 2019 17:16:37 CET jreher Updated box and position via API.
06. Sep 2019 13:09:37 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 12:28:34 CEST markus.moritz
08. Jul 2019 14:54:06 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:10 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:33 CEST Tobias Imported from Hamamatsu datasheet.