RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2610029918 - Archived data from Wed, 03. February 2021 18:23:07 CET


This is all the information about APD 2610029918. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2610029918
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2610029918/2515028661
Unit: #1313 (barcode 1309014057)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: A07
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 383.1 V
Dark current: 4.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 72
Position in Box: 18
EP1 batch: 53
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.3982296 V     T = -25 °C: 347.9404971 V
Voltage for Gain 150: T = +20 °C: 391.2419521 V     T = -25 °C: 355.3896724 V
Voltage for Gain 200: T = +20 °C: 395.6001975 V     T = -25 °C: 359.5717333 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.471008226 V-1     T = -25 °C: 4.872039624 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.719757857 V-1     T = -25 °C: 8.999225118 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.21515584 V-1     T = -25 °C: 15.86858804 V-1
Break-through voltage: T = +20 °C: 410.4767946 V     T = -25 °C: 374.7319147 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:34 CET jreher Updated box and position via API.
03. Feb 2021 18:23:07 CET jreher Updated box and position via API.
07. Oct 2020 12:09:43 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:19 CEST jreher Updated box and position via API.
11. Aug 2020 17:37:06 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:30 CET jreher Updated APD location via API.
25. Nov 2019 17:16:37 CET jreher Updated box and position via API.
06. Sep 2019 13:09:37 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 12:14:35 CEST markus.moritz
08. Jul 2019 14:54:06 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:10 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:32 CEST Tobias Imported from Hamamatsu datasheet.