RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2610029912 - Archived data from Wed, 03. February 2021 18:23:06 CET


This is all the information about APD 2610029912. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2610029912
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2610029912/0902009093
Unit: #1536 (barcode 1309016235)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D04
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382.3 V
Dark current: 8 nA
   
Screening Logistics:  
Available: No
Storage Box: 72
Position in Box: 14
EP1 batch: 53
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.2497689 V     T = -25 °C: 346.8621148 V
Voltage for Gain 150: T = +20 °C: 390.0995723 V     T = -25 °C: 354.2357987 V
Voltage for Gain 200: T = +20 °C: 394.4698317 V     T = -25 °C: 358.3758082 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.542222525 V-1     T = -25 °C: 5.001295327 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.939571331 V-1     T = -25 °C: 9.340395156 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.88340802 V-1     T = -25 °C: 14.74320443 V-1
Break-through voltage: T = +20 °C: 408.9883577 V     T = -25 °C: 372.8546804 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:33 CET jreher Updated box and position via API.
03. Feb 2021 18:23:06 CET jreher Updated box and position via API.
07. Oct 2020 16:40:33 CEST jreher Assigned to capsule by script
17. Aug 2020 15:51:09 CEST jreher Updated box and position via API.
11. Aug 2020 17:37:06 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:35:29 CET jreher Updated box and position via API.
27. Nov 2019 19:41:29 CET jreher Updated APD location via API.
25. Nov 2019 17:16:37 CET jreher Updated box and position via API.
06. Sep 2019 13:09:37 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 12:09:22 CEST markus.moritz
08. Jul 2019 14:54:06 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:10 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:31 CEST Tobias Imported from Hamamatsu datasheet.