Show Hamamatsu Avalanche Photo Diode 2610029912 - Archived data from Wed, 07. October 2020 16:40:33 CEST
This is all the information about APD 2610029912. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2610029912 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | assigned to 2610029912/0902009093 |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | blue |
Manufacturer information: | |
Wafer position: | D04 |
Break-through voltage: | 410 V |
Voltage for Gain 100 (T=+25°C): | 382.3 V |
Dark current: | 8 nA |
Screening Logistics: | |
Available: | No |
Storage Box: | 72 |
Position in Box: | 14 |
EP1 batch: | 53 |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 26. Aug 2019 |
Sent for analysis after irradiation: | 02. Sep 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 28. Aug 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 31. Aug 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 382.2497689 V T = -25 °C: 346.8621148 V |
Voltage for Gain 150: | T = +20 °C: 390.0995723 V T = -25 °C: 354.2357987 V |
Voltage for Gain 200: | T = +20 °C: 394.4698317 V T = -25 °C: 358.3758082 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.542222525 V-1 T = -25 °C: 5.001295327 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.939571331 V-1 T = -25 °C: 9.340395156 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 13.88340802 V-1 T = -25 °C: 14.74320443 V-1 |
Break-through voltage: | T = +20 °C: 408.9883577 V T = -25 °C: 372.8546804 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 10:57:33 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:23:06 CET | jreher | Updated box and position via API. |
07. Oct 2020 16:40:33 CEST | jreher | Assigned to capsule by script |
17. Aug 2020 15:51:09 CEST | jreher | Updated box and position via API. |
11. Aug 2020 17:37:06 CEST | jreher | Updated APD characteristics via API. |
20. Feb 2020 13:35:29 CET | jreher | Updated box and position via API. |
27. Nov 2019 19:41:29 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:16:37 CET | jreher | Updated box and position via API. |
06. Sep 2019 13:09:37 CEST | spankonin | Updated APD batch assignment via API. |
02. Sep 2019 12:09:22 CEST | markus.moritz | |
08. Jul 2019 14:54:06 CEST | spankonin | Updated APD batch assignment via API. |
05. Jul 2019 13:45:51 CEST | jreher | Updated APD location via API. |
03. Jan 2019 00:13:10 CET | Tobias | Corrected dark current unit. |
24. May 2018 14:39:23 CEST | Tobias | Updated location to "Bochum". |
18. May 2018 12:01:31 CEST | Tobias | Imported from Hamamatsu datasheet. |